West of Shetland

It’s a record they say. Thirty thousand tonnes of modules, 6 lifts, 5 days, West of Shetland. Blimey, history being made and old allatsea was there to see it. Gawd bless. Tis, true. The weather Gods were very very very kind to us.

P1020124P1020146P1020192P1020130

Four hundred and twenty millimetre (yes…420mm) slings in the laydown area following the installation of the two 9,000 tonne lower modules.

About allatsea

Sixty year old master-mariner. Absolutely gorgeous. Well wedged.....when compared to a Nairobi street urchin. Sorted, in that I haven't been in court recently. Hopelessly optimistic, terminally disappointed. Good with cats and other fluffy things. No musical talent. Generous to a fault provided it's someone else's round. Political centreist with far right and left viewpoints. A green activist from the hydrocarbon position with nuclear leanings. Averse to avarice but always happy to receive lottery wins, gifts, windfalls, legacies, prizes and wet sloppy kisses.
This entry was posted in Maritime and tagged , , . Bookmark the permalink.

2 Responses to West of Shetland

  1. Barbara Stead says:

    Glad weather o.k for you lot, it’s blowing a hoolie darn ear in the Saf East.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s